Details Of Relevant Verifiable Mechanical Jobs Undertaken.

MANSID has successfully completed a wide range of jobs for SPDC in the last fifteen years.  Find below list of mechanical jobs undertaken within the years.

           S/N DATE OF AWARD PROJECT TITLE CONTRACT NUMBER CLENT COMPLETION

DATE

REFERENCES
        1. 20/5/15 REPAIR OF OB35/5 & OB88/4 FLOWLINES AT OFS 4561001587/86 TEPNG 01/6/15 MOHAMMED BAWA

mohammed.bawa@external.total.com

       2. 17/5/15 OML 58 REPAIR OF OB53/4 VANDALISED FLOWLINE 4260041489/90 TEPNG 8/6/15 CHIDI OKOLI

Chidi.okoli@external.total.com   

      3. 12/11/14 OBAGI INSTALLATION OF CHECK VALVES NEXT TO ANNULUS VALVES ON GAS LIFTED WELLS IN URBAN AREAS – FFSD WORKS 456011459/89 TEPNG 14/4/15 MOHAMMED BAWA

mohammed.bawa@external.total.com

         4. 08/10/14 ECP SD2.0 NOTIFICATIONS (VALVE REPLACEMENT WORKS) – FFSD WORKS 4560114280/81 TEPNG 7/4/15 CHIDI OKOLI

Chidi.okoli@external.total.com   

        5. 16/10/14 FIFI DELUGE PIPING MODIFICATION ON TANK 81DS 301 A& B AND OB 61/4 FLOWLINE & HOOK-UP OB61/5 – FFSD WORKS 4560112769/70 TEPNG 8/4/15 CHIDI OKOLI

Chidi.okoli@external.total.com   

           6. 10/08/14 OB85/5 FLOWLINE REINSTATEMENT 4260040043/42 TEPNG 21/01/2015 CHIDI OKOLI

Chidi.okoli@external.total.com   

7. 28/05/14 INSTALLATION OF COLLAPSED FLARE STACK/WALKWAYS, PILOT LINE & RIS IN EKULAMA SWAMP2 NG01018315 SPDC ON-GOING EHIZOYANYAN  OMON omon.Ehizoyanyan@Shell.com
8. 12/05/14 NEMBE W30L & W39S SECTIONAL REPLACEMENT NG01018009 SPDC ON-GOING GODWIN AZAKA

G.azaka@shell.com

9. 3/04/14 CONSTRUCTION WORKS FOR OBAGI WELLS RECONNECTION OB90, OB24,OB102& OB85. CALL-OFF TOTAL E&P ON-GOING MOHAMMED BAWA

mohammed.bawa@external.total.com

10. 14/11/13 INSTALLATION OF GRATINGS ON IBEWA 2B WELLHEAD PLATFORM CALL-OFF TOTAL E&P 24/12/2013 KENNETH OZIGBU kenneth.ozigbu@external.total.com
11. 22/04/13 MECHANICAL MODIFICATION WORKS – SWAMP 1 & 2 EAST. NG01016029 SPDC 9/09/2013 EHIZOYANYAN  OMON
12. 04/02/13 CALL-OFF CONTRACT FOR ONSHORE PIPING WELLS HOOK-UP SERVICES. 16239921 TOTAL E&P ON-GOING UKAGWU HINEDUM, CONSTRUCTION ENGINEER. E-MAIL:  chinedum.ukagwu@total.com
13. 23/04/12 Mechanical Modification Works Swamp 2 NG01013422 SPDC 11/11/2012 Michael Ophiohonren

08070224683

14. 2011 INTEGRITY CHECK OF WELL 4L/S, 6T, 8L/S, 9L/S, 10T & 1L/S IN SANTA BARBARA. NG01010983 SPDC 12/11/2011 OLUFEMI ADEYEMI

08039754111

15. 2011 LEAK REPAIRS OF WELL 30T IN EKULAMA 1 NG01008490 SPDC 25/07/2011 OLUFEMI ADEYEMI

08039754111

 

16.

2011 CONSTRUCTION & REPLACEMENT OF FLOWLINES IN NEMBE CREEK III. NG01008490 SPDC 12/06/11 OLUFEMI ADEYEMI

08039754111

17. 16/06/10 CONSTRUCTION & REPLACEMENT OF FLOWLINES IN NEMBE CREEK II. NG01008490 SPDC 31/7/10 I. ETUKUDO, EPG-TPEEC – CONTRACT HOLDER

08070324955

18. 08/11/10 COPNSTRUCTION & REPLACEMENT OF FLOWLINES IN PES 1&2 NG01006005 SPDC 30/11/10 I. ETUKUDO, EPG-TPEEC – CONTRACT HOLDER

08070324955

19. 19/04/07 CONSTRUCTION AND HOOK-UP OF AGATHA – 1X WELLS L/S FLOW LINES/ GLL (4” X 17.52KM) E-18749 SPDC 31-12-2007 A.O.OJO, HEAD EPG-PN-TEEM

SOJI AKINBIYI – PROJECT ENGINEER 08033389285

20. 1/12/06 REPLACEMENT OF AGBADA WELLS 47 L/S FLOW LINES AND GLL  EH- 18614 SPDC 31 -05 – 2007 A.O.OJO, HEAD EPG-PN-TEEM

SOJI AKINBIYI – PROJECT ENGINEER 08033389285

21. 31/7/06 GAS LINE REPLACEMENT AND BURIAL OF AGBADA WELL 52 EH-18614 SPDC 31-01-2007 A.O.OJO, HEAD EPG-PN-TEEM

SOJI AKINBIYI – PROJECT ENGINEER 08033389285

22. 1/04/06 GAS LINE REPLACEMENT AND BURIAL OF AGBADA WELL 44, 27, 18 AND 12 EH 6510 SPDC 31-12-2006 A.O.OJO, HEAD EPG-PN-TEEM

SOJI AKINBIYI – PROJECT ENGINEER 08033389285

23. 31/03/06 CONSTRUCTION OF FLARE ROUTE PLATFORM, BUND WALL AND BURN PIT AT KOROAMA, UOM – 1 EH – 17876. SPDC 30-05-2006 RAIMI. O.M. EPG – PN – TEEM

OJEKUDOH, JEO. – PROJECT ENGINEER. 08035200868

24. 20/09/05 FLOW LINE REPLACEMENT AND BURIAL OF AGBADA WELL 8 T EH 4059 SPDC 20-04-2006 A.O.OJO, HEAD EPG-PN-TEEM

SOJI AKINBIYI – PROJECT ENGINEER 08033389285

25. 17/03/05 REPLACEMENT AND BURIAL OF FLOW LINES FOR IMOR 12 L/S EH3200 / PEA – EGBEM SPDC 16-09-2005 A.O.OJO, HEAD EPG-PN-TEEM

SOJI AKINBIYI – PROJECT ENGINEER 08033389285

26. 28/06/04 EMERGENCY LEAK REPAIRS ON OBGN 33S, IMOR 18S AND 25SF/L EH-0728 IPAE-FE SPDC 31-07-2004 AWOYELE  K – HEAD PAE – FE

SOJI AKINBIYI – PROJECT ENGINEER.

27. 15/01/04 MISCELLANEOUS FABRICATION AND INSTALLATION WORKS IN PAE FACILITIES EH 0589 SPDC 31-12-2004 AWOYELE  K – HEAD PAE – FE

ETUKUDOH S – PROJECT ENGINEER.

08055139242

28. 03/09/03 MODIFICATION OF XHP AND XXHP SEPARATORS PIPING AT KOCR F/S EG-9197. SPDC 31-03-04 AWOYELE  K – HEAD PAE – FE

ETUKUDOH S – PROJECT ENGINEER.

08055139242

29. 02/10/03 CONSTRUCTION AND COMMISSION OF DEDICATED 6” LOOP LINE OF OBGN NAG PLANT. EG8955 SPDC 31-12-2003 AWOYELE  K – HEAD PAE – FE

ETUKUDOH S – PROJECT ENGINEER.

08055139242

30. 29/10/03 Emergency leak repairs on OBGN 33S, IMOR 18S and 25S F/L EH-0728/PAE-FE SPDC 31/07/2004 ETUKUDOH S – PROJECT ENGINEER.

08055139242

31. 23/12/03 Construction of Central maintenance workshop BTIP/ARC-022 SPDC 09-02-05  HHI – HYUNDAI HEAVY INDUSTRIES CO. (NIG.) LTD.

MR. T.U. HUH

32. 01/03/02 FABRICATION AND INSTALLATION OF 10 NOS SKIMMERS AT 10 FLOW STATIONS EG 5454 PAE – FE SPDC 31-12-2002 AWOYELE  K – HEAD PAE – FE

ETUKUDOH S – PROJECT ENGINEER.

08055139242

33. 31/03/02 ISO WORKS AT AGBADA 1 AND 2 FLOW STATIONS EG – 7530 / PAE-TS SPDC 13-01-2003 AWOYELE  K – HEAD PAE – FE

ETUKUDOH S – PROJECT ENGINEER.

08055139242

34. 07/07/02 MISCELLANEOUS CIVIL/STRUCTURAL/PAINTING WORKS AT KOCR FLOW STATION AND WIP /PAE-FE. EG-6558 SPDC 20-07-2002  

R. N. AGUH  – HEAD AREA PRODUCTION ENGINEER.

35. 07/06/02 MISCELLANEOUS MECHANICAL WORKS AT KOCR FLOW STATIONS AND WIP. /PAE – FE. EG – 6559 SPDC 30-07-02 R. N. AGUH  – HEAD AREA PRODUCTION ENGINEER.